When should the plumber be involved?
As soon as you are considering fixture locations, especially if a toilet, shower or sink will move. An initial assessment can check possible routes. The rough-in takes place while pipes are accessible, before the walls close.
Can a toilet or shower be relocated?
It needs an on-site assessment. Drain location, plumbing venting, structure and floor access shape what can be changed. Choosing a new fixture alone does not establish whether the move is feasible.
Will I need a permit in Anjou?
Anjou’s guidance says a permit application is required when moving or adding a plumbing fixture. Other layout changes may also need approval. See the borough’s specific guidance (in French) and ask the Anjou permit counter about your plans.
Can you work alongside my renovation contractor?
Yes. Share your schedule and any available plans. Plumbing visits should be coordinated with the opening and closing of surfaces and the installation of new fixtures.
What affects the scope of the plumbing work?
The number of fixtures, how far they move, access to the pipes, the condition of the existing system and work already planned all matter. Photos and a sketch of both layouts make the first conversation more useful.